Purpose-Designed Facilities. Risk-Aware Location Selection.
Our data centers are purpose-designed in accordance with the principles and requirements of ANSI/TIA-942 — Telecommunications Infrastructure Standard for Data Centers.
From site selection and building design to power distribution, cooling, telecommunications infrastructure, and physical security, we follow applicable industry standards and established engineering best practices.
A comprehensive risk assessment is an integral part of our planning process. Each location is carefully evaluated to identify and minimize potential environmental, geographical, and infrastructure-related risks.
This systematic approach provides the foundation for reliable operations, infrastructure resilience, and long-term service continuity.
Design Concept
• Preliminary site assessment of flooding, seismic, industrial, and other environmental risks.
• Reinforced concrete, anti-seismic and fire resistant structure.
• Walls made of clay bricks masonry.
• Inclined roof structure to minimze risk of leakages.
• Availability and independence of utility and telecommunications infrastructure.
• Physical separation of critical technical systems.
• No windows to computer room and other critical premises.
Key Indoor Components
• Steel entrance door with electromagnetic lock system to restrict access. Fire resistance - min 45 min.
• Raised floor with antistatic coating and load capacity min. 1500kg/m2. Raised floor clearance is minimum 45 cm.
• Room clearance (the height between the raised floor and the ceiling) is minimum 260 cm.
• Walls - 2 layers of Rigips painted in white (Brilux, Malerweiss 956)
• Ceiling: Suspended ceiling for clean room AMF, 600x600mm
• Lights: Luminescent lights, min 300lux/m2
Size of doors along the delivery paths (width/height): min 170/220 cm.
• Separate cable trays for power and signal cables. Two independent routes to each item in the room.
• Power supply cables are run beneath the raised floor in fully diverse routes. Signal cables are run overhead in separate ducts for copper and optic. To each rack there are minimum 2 diverse routes from primary and secondary entrance room and telecommunication room.
• Cable ducts: Obo Beterman
• Fibre ducts: Panduit
• Building entrances: Each building has minimum two cable entrances, located more than 20m one from another.
• Cabinets: Rittal TE7000 or VX-IT, 42 U 600x1000x2000mm (W x D x H)
• Special Cabinets: Rittal VX-IT, 52 U 600x1000x2450mm (W x D x H)
Special design ensures site safety, security and redundancy.
All risks are carefully assessed and mitigated.
Security by design.
Design provides space for redundant systems and bigger racks .